I spearheaded a turnkey installation for a government power plant and designed an oil-free compressed air system with aluminum piping and air treatment. The project combined technical precision, adaptive project management, and risk mitigation in critical infrastructure.
There were frequent scope changes, stringent safety protocols, and high-security constraints. To work through the issues, I co-ordinated multidisciplinary teams and optimized system performance while ensuring zero safety incidents.
The result was an on-time and on-budget installation which boosted plant reliability. Valued at $150,000 USD, the success of the project and client satisfaction led to multiple other projects.